As Builts

Please click on the links below for the information you require. If you have any questions please contact our sales office.


**Please note that the below documents are large, and therefore may take a few moments to load**


 
Summit at The Lakes Tauranga

Stage 3A/B

Stormwater Reticulation As Built, Page 1 Retaining Wall As Built
Stormwater Reticulation As Built, Page 2 Western Batter Drain As Built
Stormwater Reticulation As Built, Page 3 Water Reticulation As Built, Page 1
Stormwater Reticulation As Built, Page 4 Water Reticulation As Built, Page 2
Stormwater Reticulation As Built, Page 5 Water Reticulation As Built, Page 3
Stormwater Reticulation As Built, Page 6 Wastewater Reticulation As Built, Page 1
Streetscape & Transportation As Built, Page 1 Wastewater Reticulation As Built, Page 2
Streetscape & Transportation As Built, Page 2 Wastewater Reticulation As Built, Page 3
Streetscape & Transportation As Built, Page 3 Wastewater Reticulation As Built, Page 4
Streetscape & Transportation As Built, Page 4 Wastewater Reticulation As Built, Page 5
Streetscape & Transportation As Built, Page 5  

Stage 3C/D Reports

Stormwater Reticulation As Built, Page 1 Water Reticulation As Built, Page 1
Stormwater Reticulation As Built, Page 2 Water Reticulation As Built, Page 2
Stormwater Reticulation As Built, Page 3 Water Reticulation As Built, Page 3
Stormwater Reticulation As Built, Page 4 Water Reticulation As Built, Page 4
Stormwater Reticulation As Built, Page 5 Water Reticulation As Built, Page 5
Stormwater Reticulation As Built, Page 6 Water Reticulation As Built, Page 6
Stormwater Reticulation As Built, Page 7 Waterwaste Reticulation As Build, Page 1
Streetscape & Transportation As Built, Page 1 Waterwaste Reticulation As Build, Page 2
Streetscape & Transportation As Built, Page 2 Waterwaste Reticulation As Build, Page 3
Streetscape & Transportation As Built, Page 3 Waterwaste Reticulation As Build, Page 4
Streetscape & Transportation As Built, Page 4 Waterwaste Reticulation As Build, Page 5
Streetscape & Transportation As Built, Page 5 Waterwaste Reticulation As Build, Page 6
Streetscape & Transportation As Built, Page 6 Lot 940 Reserve Structures As Built, Page 1
Streetscape & Transportation As Built, Page 7 Lot 940 Reserve Structures As Built, Page 2
Noise Wall Details As Built  

Stage 3E Reports

Stage 3E - Stormwater Reticulation Stage 3E - Water Reticulation:  Sheet 1
Stage 3E - Stormwater Connections and Manholes Stage 3E - Water Reticulation:  Sheet 2
Stage 3E - Wastewater Reticulation Stage 3E - Streetscape and Transportation:  Sheet 1
Stage 3E - Wastewater Connections and Manholes Stage 3E - Streetscape and Transportation:  Sheet 2

Stage 3G/H Reports

Stage 3G/H - Stormwater Reticulation: Sheet 1 Stage 3G/H - Wastewater Reticulation: Sheet 1
Stage 3G/H - Stormwater Reticulation: Sheet 2 Stage 3G/H - Wastewater Reticulation: Sheet 2
Stage 3G/H - Stormwater Reticulation: Sheet 3 Stage 3G/H - Wastewater Reticulation: Sheet 3
Stage 3G/H - Streetscape and Transportation: Sheet 1 Stage 3G/H - Water Reticulation: Sheet 1
Stage 3G/H - Streetscape and Transportation: Sheet 2 Stage 3G/H - Water Reticulation: Sheet 2
Stage 3G/H - Streetscape and Transportation: Sheet 3 Stage 3G/H - Water Reticulation: Sheet 3

Stage 3I Reports

Stage 3I - Pond 2 Cross Sections Stage 3I - Storm Water Reticulation - Sheet 1
Stage 3I - Pond 2 Layout Plan Stage 3I - Storm Water Reticulation - Sheet 2
Stage 3I - Pond 2 Outlet Details Stage 3I - Storm Water Reticulation - Sheet 3
Stage 3I - Pond 2 Storm Water Long Section Stage 3I - Storm Water Reticulation - Sheet 4
Stage 3I - Dam 2 Base of Excavation Stage 3I - Storm Water Details
Stage 3I - Dam 2 Buried Features Stage 3I - Wastewater Reticulation - Sheet 1
Stage 3I - Dam 2 Cross Sections Stage 3I - Wastewater Reticulation - Sheet 2
Stage 3I - Dam 2 Cut Contours to Base of Excavation Stage 3I - Wastewater Reticulation - Sheet 3
Stage 3I - Dam 2 Fill Contours to Finished Level Stage 3I - Wastewater Reticulation - Sheet 4
Stage 3I - Dam 2 Finished Contours Stage 3I - Water Reticulation - Sheet 1
Stage 3I - Dam 2 Original Contours Stage 3I - Water Reticulation - Sheet 2
Stage 3I - Dam 2 Storm Water Long Section Stage 3I - Water Reticulation - Sheet 3
Stage 3I - Dam 2 Surface Features Stage 3I - Water Reticulation - Sheet 4
Stage 3I - Streetscape Transportation - Sheet 1 Stage 3I - Playground
Stage 3I - Streetscape Transportation - Sheet 2 Stage 3I - Playground Details
Stage 3I - Streetscape Transportation - Sheet 3 Stage 3I - Walking Track Stairs
Stage 3I - Streetscape Transportation - Sheet 4 Stage 3I - Noise Wall
Stage 3I - Streetscape Transportation - Sheet 5 Stage 3I - Pedestrian Bridge
Stage 3I - Streetscape Transportation - Sheet 6  
Stage 3I - Streetscape Transportation - Sheet 7  

Stage 3J/K/L

Stage 3J/K/L - Stormwater Reticulation: Sheet 1 Stage 3J/K/L - Wastewater: Sheet 1
Stage 3J/K/L - Stormwater Reticulation: Sheet 2 Stage 3J/K/L - Wastewater: Sheet 2
Stage 3J/K/L - Stormwater Reticulation: Sheet 3 Stage 3J/K/L - Wastewater: Sheet 3
Stage 3J/K/L - Stormwater Reticulation: Sheet 4 Stage 3J/K/L - Wastewater: Sheet 4
Stage 3J/K/L - Stormwater Reticulation: Sheet 5 Stage 3J/K/L - Wastewater: Sheet 5
Stage 3J/K/L - Stormwater Reticulation: Sheet 6 Stage 3J/K/L - Water Reticulation: Sheet 1
Stage 3J/K/L - Streetscape Transportation - Sheet 1 Stage 3J/K/L - Water Reticulation: Sheet 2
Stage 3J/K/L - Streetscape Transportation - Sheet 2 Stage 3J/K/L - Water Reticulation: Sheet 3
Stage 3J/K/L - Streetscape Transportation - Sheet 3 Stage 3J/K/L - Water Reticulation: Sheet 4
Stage 3J/K/L - Streetscape Transportation - Sheet 4 Stage 3J/K/L - Water Reticulation: Sheet 5
Stage 3J/K/L - Streetscape Transportation - Sheet 5  
Stage 3J/K/L - Streetscape Transportation - Sheet 6  
Stage 3J/K/L - Streetscape Transportation - Sheet 7  


 


 


 
Lakeside at The Lakes

Stage 2H - The Pointe

Asbuilt Plan - To Come


 
Parkside at The Lakes

Stage 2G

As Builts


 
   

Get in touch

0800 922 778 

P: 07 579 3304
E: info@carrus.co.nz